10 Powerful Features in Domus.Cad Every Architect Should Know

Migrating Projects to Domus.Cad — Step-by-step best practices

1. Plan the migration

  • Inventory: List all projects, files, formats, textures, external references, and plugins to move.
  • Prioritize: Start with a small, representative project as a pilot.
  • Set timeline: Allocate time for backups, conversion, testing, and staff training.

2. Back up everything

  • Full backups: Create read-only archives of original files and assets (cloud + local).
  • Versioning: Tag the backup with project name, date, and software version.

3. Check compatibility and prerequisites

  • File formats: Identify source formats (DWG, DXF, IFC, OBJ, 3DS, etc.) and Domus.Cad import capabilities.
  • System requirements: Ensure target machines meet Domus.Cad’s hardware and OS specs.
  • Plugins/scripts: Catalog custom scripts or plugins; find Domus.Cad equivalents or plan workarounds.

4. Convert geometry and assets

  • Use native import tools first: Import DWG/DXF/IFC directly into Domus.Cad when possible to preserve layers and blocks.
  • Export intermediary formats: When direct import fails, export from source as IFC or a neutral format (DXF, OBJ) and import into Domus.Cad.
  • Textures & materials: Export texture maps and relink them in Domus.Cad; convert material definitions to Domus.Cad’s material system.
  • Scale & units: Confirm units and scale on import; fix mismatches immediately.

5. Recreate or map metadata and BIM data

  • Layer/level mapping: Map source layers, levels, and object types to Domus.Cad equivalents.
  • Object properties: Migrate custom properties and BIM data (room names, materials, cost codes) via IFC or CSV where supported.
  • Naming conventions: Standardize names during import to avoid conflicts.

6. Rebuild complex elements and families

  • Parametric elements: Recreate parametric components (doors, windows, stairs) using Domus.Cad’s native families if import doesn’t preserve them.
  • Scripts/macros: Translate essential automation scripts into Domus.Cad’s scripting language or replace with plugins.

7. Validate and fix geometry

  • Clash checks: Run interference checks for overlapping geometry.
  • Topology fixes: Repair open edges, flipped normals, duplicated faces, and non-manifold geometry.
  • Tolerance & precision: Adjust tolerance settings to match original model fidelity.

8. Update documentation and drawings

  • 2D sheets: Recreate or import layouts, title blocks, and annotation styles; verify scales and dimension styles.
  • Schedules & BOMs: Regenerate material schedules, takeoffs, and bills of materials in Domus.Cad.
  • Detailing: Reproduce key construction details that didn’t transfer.

9. Test workflows and performance

  • Pilot review: Have the design team review the pilot project for accuracy and usability.
  • Performance tuning: Optimize model complexity, LOD, and visibility settings for acceptable performance.
  • QA checklist: Run a checklist covering geometry, metadata, drawings, and render output.

10. Train team and update standards

  • Training: Provide focused sessions on Domus.Cad workflows, file management, and best practices found during pilot.
  • Templates & libraries: Create standardized templates, title blocks, and component libraries in Domus.Cad.
  • Documentation: Publish a migration playbook with mapping tables, common fixes, and contact points.

11. Roll out and monitor

  • Phased rollout: Migrate projects in batches based on priority and team readiness.
  • Support channel: Maintain a rapid-response support channel for migration issues.
  • Post-migration audit: Audit completed migrations against the QA checklist and correct gaps.

Quick checklist (short)

  • Backup originals
  • Pilot test one project
  • Verify formats, units, and scale
  • Map layers/metadata, convert materials
  • Recreate parametrics and detail drawings
  • Run QA, train users, and standardize templates

If you want, I can create a migration checklist tailored to your current source format (e.g., Revit, ArchiCAD, AutoCAD) — tell me which one and I’ll generate it.

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *